Today Jeran told his Dad, Daniel, that he’s surprised that I haven’t hurt myself yet while working on their bathroom. Little did he know that I’ve managed to collect memorable scrapes and punctures over the past week about which he is unaware. Most of them, I admit, were collected yesterday when Jennifer and I installed the tub and I connected the plumbing through a tiny little hole in the floor that was surrounded by screws with their pointy ends poking out.
Installing the tub wasn’t really a big deal – Jennifer and I just mixed up a 50 pound bag of thinset mortar, in one of her festively colored storage containers, for lack of a better option, and dumped it on an old tarp I’ve been using to cover the loads in my truck when I go to the dump. This mixture was situated in the area where the tub would sit then we just laid the tub back down in the gooey mess. Jennifer sat in the tub to get it back to level then stayed to enjoy the heat generated by the curing mortar while I wounded myself, over and over, connecting the drain. But it’s done, and it doesn’t leak. The fancy faucet even works. Perhaps tomorrow I’ll remember to take the camera to capture a picture before we put the walls up. I’m sure everyone is clamoring for one of those.
This morning, after coffee with Larry, Larry, and Lisa, and another trip to the church parking lot with Larry to revisit the black top patch repair job, I returned to the bathroom project. Today was Daniel’s day off and he was eager to get to work when I arrived. Our goal was to get the overlayment down on the floor. That involved replacing the toilet drain which, in turn, required removal of a bit of floor so I could get the sawsall in a position to whack the drain off at a reasonable level. Once done we had to make an ACE run to get a sleeve and a piece of 3″ ABS piping for the drain. We only needed 3 1/2 inches of piping but 2 feet is as short as they’ll go so it cost $6 for that 3.5 inches. That’s OK.
Next step was to put down a layer of roofing felt between the subfloor and the overlayment. I don’t know if roofing felt is appropriate but its way better than the really thin paper we removed on the destruction part. We wanted to do it in must two pieces but there were just too many things sticking out of the wall to allow us room to do that, so we did it in four pieces. One piece had to have two holes cut, one for the toilet and one for the A/C vent. The holes weren’t perfect, were totally fixable, but I’m not going into those details. Let’s just way the overlayment is down and looks great. Next is the linoleum. Tomorrow.
The evening ended with Diane, Jeran, and I going to the movie to watch “Despicable Me 2”. Totally fun movie. We laughed almost non-stop throughout the entire thing. The movie was Jeran’s reward for helping Diane all day long without complaint. He was tasked with cleaning up their patio and surrounding area. It was a hard task because he wasn’t sure what should go and what should stay. When Daniel and I returned from ACE Jeran was just tossing something in the dumpster and reported that he’d “found an easier way to clean up the patio.” Daniel asked him what that was and Jeran said, “I just throw away the things Grandmas tells me to throw away.” Makes sense to me. There’s no need to make decisions using that method.
Diane worked in the living room, dining room, and kitchen the last two days straightening things up, and today it was vacuuming and shampooing the living room/dining room carpets. Not an easy task. Jeran helped with a lot of that today, moving things around for Grandma. Jennifer pitched in when she got home from work.
Cedric & Lydia were participating in Pacific Camp at their church, as they’ve been doing all summer, so weren’t around to participate. They did, however, appreciate the results of everyone’s efforts.
Tomorrow, as I mentioned, is linoleum day. First, however, Diane will be driving me to the Portland VA Hospital for my physical therapy on my right shoulder. My therapist, EB, doesn’t a great job, but I don’t think what’s wrong is going to go away. So, I’m prepared to live with it and skip these trips. Therapy isn’t really helping and the next option is surgery. I’m too busy right now to entertain that option. I’d be one-handed for longer than I can go without going to the bathroom and I know Diane wouldn’t help me with that. I’ve asked before. It’s always a resounding “No! Never!” She will, however, change my Depends when necessary.
They’re pullups.
Jerry have you tried acupuncture for your shoulder. My brother has had multiple surgeries and physical therapy and all that didn’t help him so much. So he goes to the same acupuncturist that I go to. She is wonderful…if interested here is her info. Abby Drinkard, L.Ac.,M.Ac.O.M., Pacific Northwest Acupuncture & Herbal Clinic, 6655 SW Hampton, Suite 100, Portland, OR 97223
phone 503-684-9717. She and her little needles are just amazing with pain.
Thanks. Vie. I might hve to give that a try.